Power Line Features
- Start: Substation of Granadilla (Tenerife).
- End: Substation de Chayofa (Tenerife).
- Voltage: 66 kV.
- Height: Zona A.
- Number of circuits: 2.
- Support arrangement: Double flag.
- Number of conductors per phase: 1.
- Number of grounding wires: 1.
- Foundations: solids independent for each leg of support, mass concrete
Summary of work done
The scope of work included the following actions
- Support verification
- Transportation and storage of material.
- Making and reinforcement of foundations
- Hoisting assembly and support.
- Laying, hook and stapled regulated power cables and CT
- Installing conductors and CT accessories.
- Removing support.
- Demolition of foundations.
- Permitting
- Documentation AS-BUILT