Power Line Features
  • Start: Substation of Granadilla (Tenerife).
  • End: Substation de Chayofa (Tenerife).
  • Voltage: 66 kV.
  • Height: Zona A.
  • Number of circuits: 2.
  • Support arrangement: Double flag.
  • Number of conductors per phase: 1.
  • Number of grounding wires: 1.
  • Foundations: solids independent for each leg of support, mass concrete
Summary of work done

The scope of work included the following actions

  • Support verification
  • Transportation and storage of material.
  • Making and reinforcement of foundations
  • Hoisting assembly and support.
  • Laying, hook and stapled regulated power cables and CT
  • Installing conductors and CT accessories.
  • Removing support.
  • Demolition of foundations.
  • Permitting
  • Documentation AS-BUILT