Construction of a section of overhead powerline AT (132 KV), double duplex circuit required for the electrical interconnection of the North Gijon Substation and Line 132 KV AT SE Pumarin – SE Port of Gijón (Pumacar 1), both of H.C.D.E. located in the municipality of Gijón (Asturias).

Summary of work done
  • Felling and pruning of trees
  • Gathering mateiales
  • Excavation, leveling and concreting anchors. removal of surplus to an authorized landfill.
  • Armed and hoisting of supports and placement of insulation, fittings, accessories and switchgear.
  • Stretched, strained and regulated driver. Splices and connections.